Your Holdfast: Da Costa Reserve Playspace Redevelopment

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

The existing Da Costa Reserve Playspace equipment reached the end of its asset life. This is a very well used reserve and playspace by local residents and by families from Glenelg Primary School before and after school hours.

Community engagement was undertaken from 6 to 28 October 2020 and the design was refined in consideration of the feedback received.

Works commenced early April and the playspace is scheduled to be completed by the end of June 2021, weather permitting.

The existing Da Costa Reserve Playspace equipment reached the end of its asset life. This is a very well used reserve and playspace by local residents and by families from Glenelg Primary School before and after school hours.

Community engagement was undertaken from 6 to 28 October 2020 and the design was refined in consideration of the feedback received.

Works commenced early April and the playspace is scheduled to be completed by the end of June 2021, weather permitting.

Consultation has concluded
  • Design now finalised

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Upon consideration of the key engagement findings, we have adapted the original concept design with the following amendments:

    • Inclusion of more opportunities for toddler play
    • Reinstatement of the existing sandpit to allow elements of nature play
    • Addition of monkey bars
    • Refined the colour scheme for the playspace to include creams, greens and browns
    • Separating out different play nodes within the playspace
    • Refining size and location of the flying fox

    Consultation findings and the above changes in the concept were noted and endorsed by Council on 24 November 2020.

    A final concept of the playspace renewal can be found on www.yourholdfast.com/dacosta .